Future costs of dredge placement considered
Posted: 02/15/17
The District has commissioned the Burns McDonnell engineering firm to report on possible future costs of operating and maintaining its Savage dredge placement site.
More news
Aug 19, 2025, 1:57 PM
Inside, we recap the 2025 Minnesota River Boat Tour - Learn about the tour and what’s next!
Jun 26, 2025, 2:03 PM
The Lower Minnesota River Watershed District Board has adopted a bold new framework to guide our future. Drawing from the powerful address by our…
Jun 26, 2025, 1:52 PM
Six local government agencies have been selected to receive Minnesota Clean Water Funds, most of which fall within the Minnesota River basin. The…